The contractor says the work is finished. Mom has not tried it at night.

Do not let those two statements mean the same thing.

Before you sign the contract, find the lines for completion, customer acceptance, final payment, and warranty start. If the paperwork treats installation as acceptance, ask for different wording. The job should not be accepted until the entire bed-to-toilet route has been inspected and tested.

This is a paperwork decision, but make it while standing in the room. Use the same six stops each time: the bed edge, the standing space beside the bed, the bedroom exit, the hall, the bathroom entrance, and the toilet. That route is the organizing method used throughout the reading path for this desk.

First, separate installed from accepted

Circle every sentence that says when the work is complete. Look for phrases such as substantially complete, ready for use, customer approved, or accepted upon installation.

Ask the contractor to add a plain acceptance step:

“Customer acceptance occurs after the customer and contractor complete the written six-stop route check and list any unfinished or failed items.”

Then ask what happens to the final payment while an item remains open. Put that answer in the contract. Do not rely on a spoken promise that someone will come back.

If the contractor will not change the main form, ask for a signed attachment. Give it the project address, connect it to the contract, and have both sides keep a copy. General consumer guidance favors getting the project scope, payment terms, promises, and warranty information in writing; the public references behind this desk are collected on the Sources page.

Write the six-stop test into the job

The acceptance test should name what you will check, not merely say “final walkthrough.” Start at the bed and move in the order Mom will move.

At the bed edge, check that the work has not reduced the space she uses to place her feet or reach her usual support.

In the standing space, check that repaired flooring is level, fixed in place, and free of tools, packaging, raised fasteners, and loose scraps.

At the bedroom exit, open the door through its full movement. Check whether new trim, flooring, hardware, or equipment changes the clear passage.

In the hall, turn on the lights Mom will actually use. Walk beside her usual path and check every place where she changes direction or moves from one surface to another.

At the bathroom entrance, check the threshold from both directions. A route that feels smooth going in may feel different when she returns tired.

At the toilet, check the approach, turn, reach, and sitting space. Do not accept the job based only on how the installed item looks.

If Mom cannot safely participate, do not ask her to prove the work. Walk the route yourself, record what remains uncertain, and take any question about her movement, symptoms, or equipment use to her physician.

Make the contract say who leads the test

Write down the name or role of the person who must attend the final route check. “Company representative” is better than nobody, but a named project role is clearer.

Also write down who may approve corrections. The person who installs the work may not be the person allowed to promise a repair under the contract. Get the correct phone number and email before the crew leaves.

If Mom lives alone, decide who will meet the return crew and who will verify the correction. Put both names beside the open item.

Read the warranty for exclusions

Find the warranty section and underline four things: what is covered, what is excluded, what you must do to make a claim, and what remedy the contractor promises.

Ask specific questions. Does the warranty cover labor as well as materials? Does it cover loosening, shifting, separation, or adjustment? Who pays for the return visit? Does another contractor’s work cancel coverage? Must a problem be reported in a particular way?

Then make the description match the actual job. “Workmanship covered” is vague. “Contractor will correct separation of the installed transition from the floor” tells you what condition belongs in the claim.

Do not assume a product warranty covers the contractor’s installation. Ask for both documents when both apply, and write which company handles each type of problem.

Keep appearance separate from function

A finish can look imperfect without changing Mom’s route. A nearly invisible edge can still catch a toe or walker tip. Give the punch list separate columns for appearance and route function.

For each item, write the stop, the condition, the promised correction, the owner, and the retest needed. Take a photograph from the direction Mom approaches it. Add a close view only after the wider photograph shows where the problem sits on the route.

A useful entry sounds like this: “Bathroom entrance, hall-to-bath direction: right edge lifts under light foot pressure. Contractor will secure the edge and repeat the two-direction crossing test.”

Do the night check before acceptance

Return when the room can be set up as it is during Mom’s usual bathroom trip. Use the same doors, lights, walking aid, and clearances she expects to find. Do not add temporary lighting or move furniture merely to help the work pass.

Walk from bed to toilet. Then walk from toilet to bed. Stop if you find a loose surface, blocked passage, unstable support, or other condition that makes the route unsuitable for testing. Record the exact stop and notify the contractor.

If a fall happens during this period, deal with Mom first. The first ten minutes after a fall belong ahead of photographs, warranty calls, or contract notes.

What to write down

Keep one sheet with the signed contract and warranty. Write:

Project address. Contract number. Contractor contact. Six-stop test leader. Person allowed to approve corrections. Amount held until acceptance. Each open item and its owner. How a warranty claim must be submitted. What records must accompany it. Who will meet a return crew. The result of the final walk in both directions.

Do not write “fixed” until you have repeated the movement that exposed the problem. Write what you saw instead: “Edge stayed flat during both crossings,” or “door cleared the walking aid through its full swing.”

If you need local aging, transportation, or support contacts while the route remains out of service, use the St. Louis local help page. Keep that need separate from the contractor’s warranty file.

The decision

Approve the contract only if acceptance comes after the six-stop test, unfinished items have named owners, and the warranty tells you how a return visit begins.

The signature should confirm that the promised route works. It should not be the first time anyone asks whether Mom can get from the bed to the toilet and back.